Local people, global experience
The design challenges that arose throughout this project were complex and many.
As with most large projects, success often comes down to how well a diverse group of people communicate and work together towards a common goal. Our team’s expertise and the level of collaboration, along with strong leadership, project management and technical oversight, cannot be overstated. The team’s collective knowledge, patience and tolerance were critical factors in the successful delivery of the project.
SMEC worked closely with the contractors’ management and technical teams and made a conscious effort to pre-empt and solve technical challenges as they arose. The complete integration of the various levels of design and construction expertise ensured strategies were defined and implemented quickly.
SMEC’s team in Sydney led the design work with support from our Structures team in South Africa. We worked together closely and were in constant communication which was fundamental to our success. It helped us reach intelligent solutions quickly and to further build valuable relationships which proved critical during more demanding stages of the project.
Having a number of people working on the project meant that we needed a strong focus on delivery times and being responsive. Both inside and outside our organisation, we needed to prove that we could be relied on to promptly deal with problems if they occurred. We often had many short-term deadlines and we aimed to engender transparency and accountability within our team. For example, we held short open meetings every morning to discuss any outstanding and upcoming matters for the days ahead.
We had a relentless focus on quality. Because of the complexity of the bridge, two engineers worked exclusively on analysis models. They could check each other’s work at regular intervals. Scrutinising all design work and drawings at regular intervals was essential as the consequences of any mistake were severe.
Technical, complex and rewarding
The Sydney Metro Northwest Skytrain is a significant project for many reasons, not the least that the deck superstructure was first built as a seven-span continuous girder on temporary supports using an overhead self-launching gantry. Thereafter the bridge was converted into a three-span cable stayed bridge and the temporary supports were removed. The use of the precast segmental concrete for the deck superstructure was a required continuation of the main viaduct.
The challenge for the SMEC team became the integration of the techniques and temporary works used to build precast segmental concrete bridges with the demands of cable stayed bridge construction. There were many iterations to find a construction sequence that worked and, in the end, finding a practical solution was very rewarding.
Increased safety and a competitive edge
We learnt a lot technically and this project has undoubtedly proven that longer suspended precast segmental bridges can be erected using conventional erection methods. This innovative method of construction also had major safety benefits in that it eliminated the need for any day time closures of traffic lanes across Windsor Road.
SMEC’s design team also learnt a lot about the latest construction technologies. Design and build projects such as the Sydney Metro Northwest Skytrain are a tremendous opportunity for design engineers to be actively involved in the construction process. The practical knowledge they gained was, is and will continue to be invaluable throughout their careers.
The Sydney Metro Northwest Cable-Stayed Bridge was also awarded the Engineering Excellence Award by Engineers Australia, Best International Project Award by the South African Institution of Civil Engineering (SAICE) Durban, and Best International Project Award at the CESA Aon Engineering Excellence Awards in South Africa.
All images courtesy of Sydney Metro
Related
insights
SMEC’s Dr Richard Kelly, Chief Technical Principal – Geotechnical Engineering, has contributed to industry-leading research and innovation in the field of soft soil engineering.
Make no mistake, in 2018 gender is on the agenda. From pay parity to the gender gap, to women in leadership roles, the discourse regarding the role of women in traditionally male-dominated workforces is taking poll position.
Bangladesh is a country of rivers. The Karnaphuli River services the city of Chattogram (formerly called Chittagong), the largest sea port of Bangladesh. With the rapid development of southeast Bangladesh, especially in the regions south of Chattogram, the two existing bridges over the Karnaphuli River are inadequate to accommodate the increase in traffic. With a population of over six million, the heavily congested city of Chattogram is closely surrounded on the east by the Chittagong Hill Tracts and the west by the Bay of Bengal, making an additional bridge type crossing of the Karnaphuli River unviable.