![](https://smecfoundation.org/wp-content/uploads/2022/10/Dhaka-2.jpg)
12.8
km
of tunnel and 12 underground stations
4.6
km
of elevated viaduct and four elevated stations
![Dhaka Metro Alignment Map MRT](https://smecfoundation.org/wp-content/uploads/2022/10/Dhaka-Metro-Alignment-Map_MRT-5-South-1-1024x724-1.jpg)
![Dhaka Metro Alignment Map MRT 5 South](https://smecfoundation.org/wp-content/uploads/2022/10/Dhaka-Metro-Alignment-Map_MRT-5-South-2-1024x724-1.jpg)
Ready
to
connect?
Talk to one of our specialists about our role on the Dhaka Metro Mass Rapid Transit System Project.