Sibaya
Coastal
Precinct

From the early pioneers on the Snowy Mountains Hydroelectric Scheme, to our leaders and innovators of today, our people make us who we are.
Through our network of global specialists and by collaborating with local partners, we connect you with the best teams and capabilities to deliver highly innovative and sustainable solutions.
As an organisation we are continually evaluating ways we can better provide a safe, flexible, inclusive and respectful workplace for our people and clients.
People are at the heart of our organisation, we strive to create a flexible, diverse and inclusive environment that enables our people to thrive to their fullest potential.
Explore career opportunitiesSMEC South Africa was appointed to develop engineering designs of the bulk services to the Sibaya Precinct and recently appointed for the detailed design of the civil services for the Node 4 Precinct. As a continuation of the above appointments, SMEC was appointed for contract administration and close-out for the bulk sewer connections for Nodes 5 and 6.
Tongaat Hulett Developments and SMEC are committed to radical economic transformation and in this regard SMEC will sub-contract a portion (up to 40%) of the above-mentioned appointments to black owned and run consulting firms.
The existing Sibaya Casino sits in close proximity to the site and the development, when fully zoned, will include seven nodes. These nodes will be undertaken in a phased manner. New bulk services are being constructed that will service both the new and existing development.
The Sibaya Forest Conservation area is a section of approximately 310ha of pristine dune forest which forms part of the 1,000ha development. Residents and visitors will enjoy the forest by accessing boardwalks and trails and passive recreational activities will be allowed.